Froedtert Hospital Expansion
Distributor: Core & Main
Where: Milwaukee, Wisconsin
Strongbridge Products Used:
Project Specifics:
A tie-in point is installed on a 28” chilled water line as part of the Froedtert Hospital expansion project in Milwaukee, WI. This line is crucial as it provides air conditioning for the entire Froedtert Hospital Campus. The connection required a Strongbridge 28” IPS x 18” IPS large-diameter electrofusion branch saddle, angled 45 degrees downward from the main line. This large-diameter branch saddle was fused using a Strongbridge 240V electrofusion processor, Strongbridge pipe alignment clamps, and our Strongbridge large-outlet saddle tool was installed to ensure precise alignment.
Photo Credit: Mike Zwicker – Senior Lead Tech, Core & Main